Description
INSTALLATION TECHNOLOGY
Art. 49.5 – 50.3
Assuming that the vapor barrier has already been installed on the slab, position the canalizer art. 51 on the highest points of the roof in simple support. Subsequently, the insulating panel is laid, suitably perforated for the passage of the central body of the canalizer dis. B or of the pipe dis. A. Lay the waterproof membrane layer by drilling it in correspondence with the canalizer. The aerator is placed and welded with hot air over the membrane itself.
DESCRIPTION OF SPECIFICATIONS art. 50.3.
Supply and installation of ITALPROFILI® type aerators, complete with anti-insect ring and protection for ventilation between the vapor barrier and waterproofing, in TPO, consisting of a perforated channeling body to be laid at the vapor barrier level, a cylindrical aeration body of Ø mm. 75, height mm. 200 with snap-on lid and mosquito net, placed on top of the waterproof covering in TPO by means of hot air welding on the membrane.
DESCRIPTION OF SPECIFICATIONS art. 49.5.
Supply and installation of ITALPROFILI® type aerators, complete with anti-insect ring and protection for ventilation of the rooms below
(kitchens, bathrooms, etc.) to be inserted on the emerging pipes. Consisting of an aeration cylinder suitable for pipes of Ø 100 – 110, height mm. 325, equipped with a cover to be snapped into a mosquito net, with a smooth flange that can be welded above the waterproof covering in TPO by means of hot air welding above the membrane
Reviews
There are no reviews yet.